Description
FC-CH2A 12 Gauge C-Track – Galvanized Steel comes in 10ft or 20 ft sections
FC-2CH2D Track Joint Assembly – One required for each track section per run less one. Joint clamp for secure attachment and proper alignment of track sections.
FC-CH2F Track Hanger Clamp Assembly – One required for each cross arm bracket for each track run. 10′ spacing under 75 lb. trolley load. For mounting track to cross arm bracket.
FC-CH2G End Stop – One required for each track run. Bumper with mounting hardware.
FC-TMC-U Mounting Clamp for Cross Arm Bracket – Two required for each cross arm bracket. Universal mounting clamp with bolt.
FC-CH2GC Rubber End Cap
FC-CS22 End Clamp and Saddle Assembly – Standard saddle with clamp and hardware to secure cable 6 3/4″ wide. One required for each track run at storage end of track.
FC-TRT22 Tow Trolley and Saddle Assembly – 5″ trolley with four steel shielded ball bearing wheels and standard saddle with cut out box for tow bar. Load Rating: 75 lb. max. One required for each piece of moving equipment to be electrified.
FC-TB1 Tow Bar – For mounting on moving equipment, 18″ long. One required for each tow trolley.
FC-TRC22 Control Trolley Assemblies for Push Button Station – Two trolley and one standard saddle mounted on bracket plus fittings to attach control box. Control box not included.
FC-BX1 Junction Boxes and Terminal Strips – Steel junction box 8″ x 10″ x 4″ for control trolley FC-TRC22. Rated NEMA 13. Accepts up to two terminal strips
FC-TR22 Intermediate Trolley-Saddle Assemblies – 5″, high strength aluminum body with four steel shielded ball bearing wheels and standard saddle. Trolley Load Rating: 75 lb. Max
FC-TRB2 Trolley Bumpers – Hard rubber bumpers with mounting screw